2017-09-07: Hurricane Irma


We are keeping a close eye on Hurricane Irma.  The path of the hurricane shows a likely impact to the state of Florida, and posssible impact later to North Carolina.

As such, we will continue to monitor this storm closely and evaluate the operating conditions in both our Miami (MIA) and Raleigh-Durham (RDU) datacenter facilities:

Fuel supply is confirmed at both sites, and generators have been tested this week.  We will post further updates as they become available.

Miami:  The datacenter is not at risk of flooding, as it is on the 4th floor.  The building is structurally designed to withstand natural disasters and is a category 5 safe building.


This entry was posted in Uncategorized. Bookmark the permalink.