2016-09-03: Chennai Cloud Maintenance

Posted on

We will be performing a major upgrade on our Chennai Cloud POP during 
the following timeframe (Local time IST)

Start: 2016/09/03 17:00:00
End: 2016/09/03 21:00:00

Anycast traffic will be automatically re-routed during this event.

During the maintenance window, we will be shifting network
connectivity, as well as shutting down some parts of our cloud for
physical relocation.   Your cloud server will be safely suspended and
unavailable for a period of 2-4 hours during this maintenance event.


2016-08-27: Seattle Cloud POP Upgrade

Posted on

Seattle POP Upgrade

We will be performing a major upgrade on our Seattle Cloud POP during
the following timeframe (Local time PDT)

Start: 2016-08-27 19:00 
End: 2016-08-27 23:30

Anycast traffic will be automatically re-routed during this event.

During the maintenance window, we will be shifting network
connectivity, as well as shutting down some parts of our cloud for
physical relocation.   Your cloud server will be safely suspended and
unavailable for a period of 2-4 hours during this maintenance event.




2016-07-13: Sydney, AU

Posted on

We are currently experiencing an issue impacting international/management traffic in our Sydney PoP and are investigating.

Update: Although local traffic is not impacted, we've disabled anycast in this PoP until resolution. Unfortunately there is no ETR at this time, and further updates will be provided.

Update: Full connectivity has been restored. We are evaluating root cause and will determine when to enable additional services in this PoP. 


2016-06-30: Miami Maintenance July 9 2016

Posted on


We will be performing a major upgrade on our Miami Cloud POP during
the following timeframe (Local time EDT)

Anycast traffic will be diverted for the duration of this event.


Start: 2016-07-09 20:00 (local time)
End: 2016-07-09 23:59 (local time)

During the maintenance window, we will be shifting network
connectivity, as well as shutting down some parts of our cloud for
physical relocation.   

Affected customers have been notified by e-mail.



2016-06-28: Sao Paulo (GRU) Network Maintenance

Posted on

Date:  June 28 2016
Start time:  01:00 UTC
End time:  09:00 UTC

Scope of work:  Host Virtual Sao Paulo Brazil Network

Description of work:  Our Network Engineers will be performing routine maintenance including software upgrades on our network infrastructure to ensure stability.

Estimated Downtime:  During this maintenance window, we are expecting minor network disruptions totaling up to 15 minutes of downtime.

Thank you so much for taking the time to review this notice. If you have any questions or concerns about this scheduled maintenance, please do not hesitate to contact our staff for more assistance. 


2016-06-25: London – Cloud Maintenance June 25

Posted on


We will be performing a major upgrade on our London Cloud POP during
the following timeframe (Local time BST)

Anycast traffic will be diverted for the duration of this event.


Start: 2016-06-25 20:00 (local time)
End: 2016-06-25 23:59 (local time)

During the maintenance window, we will be shifting network
connectivity, as well as shutting down some parts of our cloud for
physical relocation.   

Affected customers have been notified by e-mail.

The London maintenance was successfully completed on schedule


2016-06-16: Bucharest Cloud Maintenance

Posted on

We will be performing emergency maintenance in Bucharest beginning on:

Starting: Thursday, June 16, 2016 at 4:00:00 PM UTC 
Ending: Thursday, June 16, 2016 at 6:00:00 PM UTC

During this time we will be upgrading equipment and performing physical maintenance. Due to the nature of the work instances may be powered off and network connectivity may re-route through alternative carriers or be unavailable. We will do our best to minimize the impact.

Note that Anycast traffic will be diverted from this POP for the duration of the maintenance. 

Update: The maintenance has completed and service has returned to normal.


2016-06-25: London – Cloud Maintenance June 25 (reschedul

Posted on

Update: This maintenance has been rescheduled to June 25th beginning at 8pm BST.

We will be performing a major upgrade on our London Cloud POP during
the following timeframe (Local time BST)

Anycast traffic will be diverted for the duration of this event.


Start: 2016-06-03 20:00 (local time)
End: 2016-06-04 10:00 (local time)

During the maintenance window, we will be shifting network
connectivity, as well as shutting down some parts of our cloud for
physical relocation.   

Affected customers have been notified by e-mail.


2016-06-03: London – Cloud Maintenance June 3-4

Posted on


We will be performing a major upgrade on our London Cloud POP during
the following timeframe (Local time BST)

Anycast traffic will be diverted for the duration of this event.


Start: 2016-06-03 20:00 (local time)
End: 2016-06-04 10:00 (local time)

During the maintenance window, we will be shifting network
connectivity, as well as shutting down some parts of our cloud for
physical relocation.   

Affected customers have been notified by e-mail.